August 2013 - Jay with Version 01 prototype wind turbine in cow pasture.
August 2013 - Movie of Version 01 lazy performance in 7-10 MPH wind..
August 2013 - Movie of Version 01 chain needs idler sprocket tensioner..
August 2013 - Prototype Version 02 with Vinyl gutter blades and plastic windshield.
August 2013 - Prototype Version 02 chain tensioner idler sprocket.
September 2013 - Prototype Version 02 on framework, ready for photovoltaic panels - hybrid.
September 2013 - Prototype Version 02 framework detail.
October 2013 - Prototype Version 03 with solar P V panels installed .
October 2013 - Prototype Version 03 with solar P V panels installed.
October 2013 - Underside of P V panels showing wiring .
October 2013 - Prototype Version 03 toothed belt drive.
October 2013 - Electrical box with webcam to send pics of meters to web .
October 2013 - Electrical box showing volt & amp meters. P V panelcontroller on wall behind weatherstation receiver, .
October 2013 - Three 100 watt photovoltaic P V panels - .
October 2013 - Webcam pic of meters inside box..
October 2013 - Weatherstation statistics..
November 2013 - Alternator mounted on Turbine 02 - takes a bit of torque now (strong wind) to turn the blades - .
November 2013 - Alternator mounted on Turbine 02 in place on framework .
November 2013 - Alternator mounted on Turbine 02 .
November 2013 - Electrical box with wind controller and third gauge for wind volts & amps - .
November 2013 - Electrical box - view of back tangle of wires .
August 2014 - Metal drilling bit on 2 inch plastic pipe .
August 2014 - Water head to force water down the plastic pipe .
August 2014 - Drilling down through the clay & small rocks .
August 2014 - Going deeper - we stopped in sand at 20 feet, water table currently at 7 feet.
August 2014 - Jay with well, sealed with cement and concrete pad for pump .
August 2014 - Jay showing water pumped with PhotoVoltaic system .
January 2015 - Additional 3 P V panels installed .
April 2015 - Charge controller for new panels on right, batteries gone .
April 2015 - Batteries moved to new box for easy access .
August 2015 - Battery box & pump house painted .