![]() | Fall/Winter 2013 November 2013 - Ginger`s trailer with new eyebrows (gutters) and window awnings. Airstream project. |
![]() | Fall/Winter 2013 November 2013 - Ginger`s trailer with new eyebrows (gutters) and window awnings. Airstream project. |
![]() | January 2011 - 1967 Airstream Globetrotter (20 feet) before TLC. |
![]() | January 2011 - 1967 Airstream Globetrotter (20 feet) before TLC. |
![]() | January 2011 - Old water pump and water tank on rotten floor. |
![]() | January 2011 - Old water heater and bathroom vanity section. |
![]() | January 2011 - Bathroom partition. |
![]() | January 2011 - Toilet and tub/shower. |
![]() | January 2011 - Wide angle of rusty frame. |
![]() | January 2011 - Panorama of rusty frame.. |
![]() | January 2011 - Rusted step. |
![]() | January 2011 - Rusted frame with old step cut out. |
![]() | January 2011 - Frame painted with POR-15. New wheel tubs ready forinstallation. |
![]() | January 2011 - Paul welding repair rusted frame section. |
![]() | January 2011 - New step installed in repaired section. |
![]() | January 2011 - Rusted support for black water tank. |
![]() | February 2011 - Belly pan pieces with new sheet to replace one of them. |
![]() | February 2011 - Black water tank and rusted sheet metal box. |
![]() | March 2011 - Tabs welded to frame for bolting to shell. |
![]() | March 2011 - Tabs welded to frame for bolting to threshold (shell). |
![]() | March 2011 - Ginger starting to put in the new floor. |
![]() | March 2011 - New floor with elevator bolts. |
![]() | March 2011 - Epoxyed new flange to black-water tank. |
![]() | March 2011 - Repaired black-water tank. |
![]() | April 2011 - Remainder of the plywood floor going in. |
![]() | May 2011 - Bathroom corner linoleum in with abs ready to be reassembled. |
![]() | May 2011 - Bathroom corner linoleum in with abs ready to be reassembled. |
![]() | June 2011 - Ginger drilling out rivets in old smaller window. |
![]() | June 2011 - Old window ready to be removed. |
![]() | June 2011 - Old window out, hole cut larger for wider window. |
![]() | June 2011 - New window held in place temporarily with clecos. |
![]() | July 2011 - Polishing the shell. Masking to avoid greasy black stuff. |
![]() | July 2011 - Ginger polishing the shell. |
![]() | July 2011 - Polishing the shell. Not a mirror yet, but a lot shinier |
![]() | July 2011 - DC electrical panel and batterys. |
![]() | July 2011 - Water pump & tank with level sensors |
![]() | July 2011 - Hot & cold water manifolds and P V C braided flex tubing. |
![]() | July 2011 - Hot water heat and Ts for supply to sink. |
![]() | October 2011 - Bathroom pieces in place. |
![]() | October 2011 - Bathroom pieces in place. |
![]() | October 2011 - Bathroom partitions up - original panels on bath side. |
![]() | October 2011 - Gap for missing pocket door between panels. |
![]() | October 2011 - Pleated (accordion) vinyl door in lieu of pocket door. |
![]() | October 2011 - Cupboard rebuilt & cut down by 2 inches. |
![]() | October 2011 - Cupboard installed with doors from Ebay, also cut down. |
![]() | November 2011 - Black iron pipes for propane. |
![]() | November 2011 - Propane bottles on newly welded in stand. |
![]() | November 2011 - Driver side cupboard reinstalled. |
![]() | November 2011 - Front cupboard resized for door with plex mirrors. |
![]() | November 2011 - Steel frame for dinette. |
![]() | December 2011 - Frame with wood on legs & 1/4 ply backing. |
![]() | December 2011 - Seat base with plastic panel glued to ply. |
![]() | January 2012 - Seats and backs upholstered and installed. |
![]() | January 2012 - 12 volt DC wiring behind panel & under seat. |
![]() | January 2012 - 12 volt panel for DC circuits, tank level indicators, & photovoltaic control. |
![]() | January 2012 - Starting to look better, w running lights on the polished portion. |
![]() | January 2012 - Martha polishing. |
![]() | January 2012 - Martha polishing - its like a mirror. |
![]() | January 2012 - Sketchup plan of driver side interior and dinette.. |
![]() | January 2012 - Sketchup plan of kitchen.. |
![]() | January 2012 - Uprights for folding countertop. |
![]() | January 2012 - Routing slot for countertop trim. |
![]() | January 2012 - Richard at new boomerang formica table. |
![]() | January 2012 - Second bed deployed. |
![]() | February 2012 - Shelf up with cushions for 2 beds. |
![]() | February 2012 - Building raised platform for frig. |
![]() | February 2012 - Frig in place, w support on wall for large sink. |
![]() | February 2012 - Frame for sink cabinet with plastic on faces |
![]() | February 2012 - Storage cabinet frame with steel face & wood sides. |
![]() | March 2012 - Microwave shelf and plastic facings. |
![]() | March 2012 - Second battery switch, for inverter & tow vehicle power,. |
![]() | March 2012 - Storage Cabinet with doors, TV & electronics shelf. |
![]() | March 2012 - Sink Cabinet with doors. |
![]() | April 2012 - Curtains with trim matching formica. |
![]() | April 2012 - Martha with TV cover she made. |
![]() | June 2012 - New stronger axle finally installed. |
![]() | July 2012 - Awning installed. |